Home > Videos > 

Trans-Yangtze River Bridge installs 1st steel structure

The bridge has installed its 1st steel framework ,weighing 907 tonnes.

XinhuaUpdated: May 14, 2018
Video Player is loading.
Loaded: 0%
Stream Type LIVE
 
1x
--:-- / --:--